border  
border
 
 
 
Loading

Contact Us:
+1 (281) 241-9418 Toll Free: (855) 591-0906
Se habla espaņol
Facebook
left border  
 

FEATURED PRODUCT ARCHIVES >>

Duct Work for Absorbing Tower Piping in an Acid Plant (PT&P Ref#93646) 5/09/2011
Duct Work for Absorbing Tower Piping in an Acid Plant

 

 

 

 

 

 

This duct work was fabricated with mitered elbows from SA-516 grade 70 carbon steel, and was designed for absorbing tower piping in an acid plant. It has a 72" outside diameter and measures 23"-2/4" from the centerline, elbow to elbow. This assembly was only a single portion of a duct work system that included 36", 48" and 60" diameter sections of fabricated duct work. The duct work was fabricated with roundness tolerance of +/- 1/8". A 100% dye penetrant test, soap and air test, and spot x-ray testing of all pipe circumferential and long seam welds was performed prior to shipment.

Duct Work for Absorbing Tower Piping in an Acid Plant

 

 

 

 

 

 

U.S. Bellows Request for Quotation
  First Name *
 
  Last Name *
 
  Email *
 
  Phone *
 
  Item Description & Quantities *
 
  Date Quote Needed By *
 
border
border
   
border

Contact Us: +1 (281) 241-9418 Toll Free: (855) 591-0906 Fax: +1 (713) 731-8640 sales@usbellows.com
Our Parent Company: Piping Technology Pipe Supports, Pipe Clamps, Pipe Hardware & Insulated Pipe Shoes
Fellow Subsidiaries: Sweco Fab: ASME Vessels, Pig Launchers, Duct Work, Strainers & Spectacle Blinds
 Pipe Shields: Pre-Insulated Pipe Supports, Slides, Guides & Anchors

Fronek Anchor/Darling
: Snubbers, Sway Struts & Sway Braces


Copyright © 2011  U.S. Bellows, Inc. All Rights Reserved. Privacy Policy