U.S. Bellows U.S. BELLOWS, INC.
EXPANSION JOINT CATALOG
  Contact Us: +1 (281) 241-9418 Toll Free: (855) 591-0906   Se habla español
     
Return to usbellows.com
download pdfDownload Entire Catalog [PDF]
Installation
 

INSPECTION DURING AND IMMEDIATELY AFTER SYSTEM PRESSURE TESTS

   
 

 

 

WARNING: EXTREME CARE MUST BE EXERCISED WHILE INSPECTING ANY PRESSURIZED SYSTEM OR COMPONENT.

A visual inspection of the system shall include checking for the following.

  • Evidence of leakage or loss of pressure.

  • Distortion or yielding of anchors, expansion joint hardware, the bellows and other piping components.

  • Any unanticipated movement of the piping due to pressure.Evidence of instability (squirm) in the bellows.

  • The guides, expansion joints and other moveable parts of the system shall be inspected for evidence of binding.

  • Any evidence of abnormality or damage shall be reviewed and evaluated by competent design authority.

border

Contact Us: +1 (281) 241-9418 Toll Free: (855) 591-0906 Fax: +1 (713) 731-8640 sales@usbellows.com
Our Parent Company: Piping Technology Pipe Supports, Pipe Clamps, Pipe Hardware & Insulated Pipe Shoes
Fellow Subsidiaries: Sweco Fab: ASME Vessels, Pig Launchers, Duct Work, Strainers & Spectacle Blinds
 Pipe Shields: Pre-Insulated Pipe Supports, Slides, Guides & Anchors

Fronek Anchor/Darling
: Snubbers, Sway Struts & Sway Braces

Copyright © 2011  U.S. Bellows, Inc. All Rights Reserved. Privacy Policy