border  
U.S. Bellows U.S. BELLOWS, INC.
FABRIC EXPANSION JOINT CATALOG
  Contact Us: +1 (281) 241-9418 Toll Free: (855) 591-0906   Se habla español
   
Return to usbellows.com

download pdf Download Fabric Expansion Joint Catalog [PDF]

Download Metallic Expansion Joint CatalogDownload Metallic Pipe Expansion Joint Catalog [PDF]

 
U.S. Bellows Request for Quotation

Fluoroplastic Belt Splice, HT Composite Belts

left border  

HT Composite Belt Splice

Installation Instructions [PDF]

U.S. Bellows highly recommends that a test splice be performed prior to actual splice.

Thank you for purchasing FLEXXCEL Fabric Expansion Joint material. Prior to performing the actual splice on your expansion joint, please complete a U.S. Bellows Test Splice. Refer to the U.S. Bellows Test Splice instructions for details.

Safety Precautions

Experience has shown fluoropolymers can be processed and used at elevated temperatures without hazard if proper ventilation is used. Make certain all heat sealing is performed in well ventilated areas. Make certain the heat sealer is safely handled during use. The heat sealer temperature will reach 725F in normal operation. Special care must be taken with the heat sealer during handling due to the high temperature.

Equipment Required to Splice FLEXXCEL materials

Equipment required to splice FLEXXCEL materials:

  1. Heat Seal Iron
  2. Backer Board
  3. FLEXXCEL belting material
  4. PFA heat sealing film
  5. ensureAsplice product
  6. Stapler*
  7. Scissors*
  8. Blade Knife*
  9. Tape Measurer*
  10. Marking Pen*

*These items are not included in the kit.

Heat Seal Iron Operation

To operate the Heat Seal Iron, follow these instructions:

  1. Plug the unit into an electrical outlet.
  2. Place the Heat Seal Iron on the FLEXXCEL Backer Board or another insulated surface.
  3. Push the toggle switch up to the "on" position.
  4. Set the temperature by turning the dial to the desired temperature. A temperature range of 700°-740°F (370°-385°C) is typical for splicing U.S. Bellows FLEXXCEL materials.
  5. If ambient conditions are ideal, each splice section should take approximately 5 minutes.

The unit contains two lights, a "heat up" light and a "ready" light. The "heat up" light will remain lit until the unit reaches the set temperature, at which point the "ready" light will go on.

HT Composite Belt Splice

Install the FLEXXCEL HT composite belt material on the expansion joint frames per the belt installation instructions. The Heat Seal Splice should be performed prior to the last backup-bars being installed. The belt ends should overlap 8" to 12".

HT Composite Belt Layers

Peel back of fabric expansion joint cuff material

Peel back cuff material. Expose layers of mesh and aluminized cloth. The layer of mesh/cloth that does not contain the grommets should be closest to the gas stream. The layer of mesh/cloth that contains the grommets should be the next layer.

HT Composite Belt Layers

Fabric Belt layers of insulation

Overlap the layers of insulation. At the end of the overlap, mark the material. Cut the insulation along the mark. The ends of each layer of insulation should "butt up".

Cut the insulation along the mark

the outer layer of FlexxCel HT material

Overlap and mark the outer layer of FLEXXCEL HT material. Score the line with a razor knife. Cut through the entire thickness of the FLEXXCEL HT material.

FlexxCel HT material.

FlexxCel HT belt material

The FLEXXCEL HT belt
material is "butted up" and ready to splice. However, first, peel back all materials and expose the cloth and mesh layers. Use the grommets as a guide and mark each hole onto the inner most layer of aluminized cloth.

FlexxCel HT belt material

the bottom layer of cloth

Punch holes in the bottom layer of cloth. Line up punched holes with the grommets. Install nuts, bolts and washers to secure the layers of cloth/mesh. Hand tighten all nuts.

the bottom layer of cloth

The insulation layers

The insulation layers are put back into the "butted up" position. Place the backer board on the insulation layer, under the FLEXXCEL HT material.

The insulation layers

PFA film

Cut PFA film and 3" wide FLEXXCEL HT material saddle strip to equal the width of the installed belt. Staple the PFA film to the "gas side" of the FLEXXCEL material strip. Place the saddle strip over the butted up FLEXXCEL HT material, the PFA film facing down.

FlexxCel material strip

Heat Seal Iron and Fabric Expasnion Joint Material

Place the iron at edge of belt to begin splice. Depending on width of belt, it may be necessary to perform multiple splices across the width of the belt. Step iron across width of belt, overlapping each splice 1/2". Apply pressure to iron handles during each splice. Each splice section should take approximately 5 minutes.


Fabric Belt

Upon completion of all necessary splices, allow belt to cool prior to additional handling.

When sufficiently cooled, place the "cuff" material back into place. Trim excess cuff material.

Fabric Material Cuff and Trim Fabric Material Cuff and Trim

Fabric Belt in Place

Clamp the belt and back up bars into place and drill remaining holes in the belt. Bolt the back up bars into place. Expansion joint splice and installation is complete.

Completed Fabric Belt

 

border

Contact Us: +1 (281) 241-9418 Toll Free: (855) 591-0906 Fax: +1 (713) 731-8640 sales@usbellows.com
Our Parent Company: Piping Technology Pipe Supports, Pipe Clamps, Pipe Hardware & Insulated Pipe Shoes
Fellow Subsidiaries: Sweco Fab: ASME Vessels, Pig Launchers, Duct Work, Strainers & Spectacle Blinds
 Pipe Shields: Pre-Insulated Pipe Supports, Slides, Guides & Anchors

Fronek Anchor/Darling
: Snubbers, Sway Struts & Sway Braces


Copyright © 2017  U.S. Bellows, Inc. All Rights Reserved. Privacy Policy